2. Renovation of Auditorium · Addition of third floor is prohibited by zoning restrictions · Renovate the auditorium into four classrooms, offices and a chapel à Loss of auditorium gathering space means church would have to use lower or upper church parlor for congregational gatherings & alternative worship space à Unfavorable traffic flow in LCP for worship or all-church meals à Access by stairs or elevator required for use of UCP; kitchen would be on a different floor · Keep the auditorium as an open, large gathering space à Perform necessary renovations for general maintenance, climate control and marketability as leased space à Architect Ernie Harris worked on this design and has estimated construction costs at $250,000 (see page 4)
3. Renovation of Breezeway between Lower Church Parlor & Auditorium (architect Ernie Harris) · Currently wasted space · Create a main entrance to the church facilities from the back driveway · Space would include the Admin. Asst.’s office and serve as the main reception area · Cost prohibitive for current consideration à Estimated construction cost = $650,000 à It is, perhaps, an idea to incorporate into a long range plan, along with appropriate and helpful signage on the property
4. Sitework · Reconfiguration and repaving of parking lot · Landscaping · Estimated cost = $250,000
Funding Possibilities
· Capital campaign (1993 restoration capital campaign raised about $450,000 from our congregation) · Loan/mortgage: how do we manage an additional monthly financial obligation? · Sale of Church House property (approximately $1M) · Grants (unknown)
KEY to abbreviations: MCNS=Mamaroneck Community Nursery School LCP=Lower Church Parlor UCP=Upper Church Parlor CH=Church House |
|